Learn about the ongoing 公共工程 and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Fruitland Avenue Avenue of the Americas Sidewalk
Last Updated: 06/04/2024 Category: 已缴纳的销售税 类别:人行道 当前阶段: 建设
Fruitland Avenue Avenue of the Americas SidewalkGreater Port Charlotte MSBU Bridge Rehabilitations - #014030, #014043, #014069
Last Updated: 06/04/2024 类别:桥梁 当前阶段: 设计开发
Greater Port Charlotte MSBU Bridge Rehabilitations - #014030, #014043 and #014069
Quesada Avenue Sidewalk and Pedestrian Signals
Last Updated: 06/04/2024 类别:人行道 Category: 已缴纳的销售税 当前阶段: 设计开发
Quesada Avenue sidewalk and pedestrian signalsMid-County Library Hurricane Repairs
Last Updated: 06/03/2024 Category: 县设施 当前阶段: Planning and Project Approval
Utilizing the Hurricane repair consultant contract as well as the construction manager at risk for Mid-County repairs contract, design and restore the Mid-County Library to its condition prior to the event. Utilize the opportunity to make improvements to the facility where applicable following the guidelines of the County's insurance policy.
小威廉·R·盖恩斯. Veterans Memorial Park Phase II
Last Updated: 06/03/2024 Category: 公园和娱乐 Category: 已缴纳的销售税 当前阶段: Planning and Project Approval
威廉R. 盖恩斯小. Veterans Memorial Park phase II design and construction.Last Updated: 06/03/2024 Category: 公园和娱乐 Category: 已缴纳的销售税 当前阶段: Planning and Project Approval
GC Herring Phase I design and construction. Redevelopment of the park will include necessary amenities for a community park as identified in the Parks and 娱乐 master Plan.Babcock Ranch CCSO District 5 Office
Last Updated: 05/31/2024 Category: 县设施 当前阶段: 建设
A Master Developement Order agreement between Charlotte County and the developer has been made to build a new Law Enforcement Office located in southern Charlotte County as part of the Master Babcock Ranch Concept Plan.Riverside Boat Ramp Replacement
Last Updated: 05/31/2024 Category: 公园和娱乐 当前阶段: 设计开发
作为CMP的一部分, 社区服务 is conducting structural assessments on all piers, 栈道, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues.
Sheriff District 4 HQ, Training Facility and K9 Unit
Last Updated: 05/31/2024 Category: 县设施 Category: 已缴纳的销售税 当前阶段: 建设
建设 of a replacement District 4 Headquarters Facility with a training component and K9 kennel/training area replacing existing facilites. The district office will utilize the prototype layout from District 1. The training building area will be incorporated into a single facility. The facility will be constructed at the Airport 路 Annex site, replacing the existing Sheriff's Training, Supervisor of Election and old Transit Facility .